Termites work out of sight, so most homes only notice them once skirting, door frames or furniture start sounding hollow. Our technicians trace the colony route first, then treat the soil and the woodwork so the whole run is covered — not just the spot you can see.
Post-construction jobs use the drill-fill-seal method along wall–floor junctions: 12 mm holes at fixed intervals, injection of a termiticide emulsion, then sealing and finishing so the treatment is invisible once we leave. Pre-construction work is done in stages during plinth filling.
Tell us what you are seeing and where. We inspect free, quote upfront and give you a same-day or next-day slot wherever our team is already working.
94533 94533 Chat on WhatsAppBook a visitSafe around children and pets.
Trained staff, no subcontractors.
Quoted before we start work.
Free follow-up within the warranty.
A 2BHK usually takes three to five hours in one visit. Larger homes and shops with heavy woodwork are done over two visits.
No. The chemicals we use for post-construction work are odourless and applied inside the wall-floor line, so the flat stays usable the same day.
Yes — post-construction termite treatment carries a written warranty, and any re-treatment needed inside that period is free.
Tell us the pest and your area — we call back with a slot and an upfront price.